Project: RANS21RB   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Randall Brooks   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:1985
Total Flight Time:
Start/Last Date:Apr 03, 2021 - No Finish Date
Engine:Titan IO-340 180HP
Propeller:Whirlwind
 
Friendly URL: https://eaabuilderslog.org?s=RANS21RB

Home or Last Project Picture

Jun 22, 2022     Wheel, Brake and Tires - (3 hours)       Category: Landing Gear
Disassembled one brake assembly and inventoried parts. Reviewed Matco manual. Coated tube with small amount of baby powder ( a little goes a long way!).
Partially inflated tube and assembled wheel halves. Torqued wheel hardware to 100 in lbs. Inflated tube to about 11psi and noticed a leak (or what I thought was a leak) around the base of the valve stem when I deflected it to the side slightly. Didn't know if tube was leaking so I disassembled wheel and installed other tube. Tightened wheel nuts and inflated tube again. Same thing happened-- but it lessened and eventually stopped. I'm sure what happened was the air trapped inside the tire when the tube was inflated was escaping at the base of the valve stem- it's a tight seal around the bead of the tire.. I assembled the brake assembly and axle. Torqued wheel and disc hardware. Ready to assemble on gear leg. I brought first tube home to leak check in water and no leaks were noted.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.